POSITION OF WATER AT KOTRI BARRAGE ( 12.7.14 - TopicsExpress



          

POSITION OF WATER AT KOTRI BARRAGE ( 12.7.14 ) ------------------------------------------------------------------ Position of Barrages as on 12.7.2014 :- Tarbela Dam Capacity RL 1461 Filled up to RL 1462.14 Filled above required level 1.14ft Mangla Dam Capacity RL 1242 Filled up to RL 1205.75 Still space to be filled 36.25ft Punjab withdrawal : From Indus........C.J. Link 2000 cs Thal Canal 8300 cs T.P.Link 7791cs Muzafargharh Canal 7400 D. G. Khan canal 8300 From Jhelum Mangla 25000 From Chenab 62,956 cs Total 1,21,747 cs KPK withdrawal C R B C 4400 cs Released for Sindh and Baluchistan : From Taunsa Barrage 2, 26,773 cs Released from Panjnad 10,744 Total released 2, 37,517 cs Reached at Guddu Barrage 2, 16,052 Loss /theft in between 21,465 Released from Guddu for Sukkur 1,76,237 cs Reached at Sukkur Barrage 1,40,390 cs Theft /loss in between 35,847 cs Released from Sukkur for Kotri Barrage 84,560 cs Reached at Kotri Barrage 68,830CS Theft / Loss in between 15,730 cs Minimum requirement of Kotri Barrage 50,000 cs …….Fulfilled Shortage fall at Kotri Barrage Nil Kotri downstream 29,285 cs / day i.e 57,984.3 acre ft / day As per water Accord, 10 MAF annually Is to be released downstream Kotri .River flows Only 4 months.Thus per day D/S flow should be 83,333.33 acre ft Total Releases from Tarbela 1, 75,000 cs From Kabul 67,300 cs Added d/s Kabul out flow (-) 7082 cs where gone Inflows from tributaries d/s Jinnah barrage 1352 cs Chashma 10, 834 cs Inflows added in between Chashma and Taunsa 20,264 CS…..?? From Chenab 73,700 cs From Mangla 25000cs Total 3, 66,368 cs (A) Releases to Provinces :- Punjab 1, 21,747cs KPK ( CRBC ) 4400 cs Sindh, Baluchistan I/c for D/S Kotri 2, 37,517cs Total 3, 63,664 cs (B) NOTES 1 – Figures at Kala Bagh, Chashma Barrage, and Taunsa Barrage, placed on web site seem ambiguous. Between Tarbela and Jinnah barrage 7082 cusecs went missing. In between Chashma and Taunsa 20,264 cusecs, have been shown increased. Losses between barrages from Taunsa to Kotri are also abnormal. Wrong Gauge Reporting also can, not be ruled out. Read about incorrect gauge reporting and theft of water, in today’s Dawn on page -3 2- Thal Flood Canal and C.J.Link are flowing. 3- No details about releases in Rainee Canal at Guddu Barrage 4- Flood Canals off taking from Fuleli Canal are also flowing, leaving actual command on tail uncultivated. 4- Command area of Rohri and Nara canal, transferred on LBCAWB Through D.Os, Lift Machines and Flood Canals; be brought back on original sources, so That the command area of LBCAWB rendered barren be irrigated. ( G.R.Talpur )
Posted on: Sat, 12 Jul 2014 14:06:27 +0000

Trending Topics



Recently Viewed Topics




© 2015