Posts by Peckham Rye Station
The CoDesign exercise that has been conducted over the last 8
The CoDesign exercise that has been conducted over the last 8 weeks concludes today Friday 7th November. Everyone is invited to drop in TODAY at the C...
The CoDesign exercise that has been conducted over the last 8 weeks concludes today Friday 7th November. Everyone is invited to drop in TODAY at the C...
The stages and timescale for the PeckhamCoDesign process is
The stages and timescale for the PeckhamCoDesign process is described in 7 stages on: peckhamcodesign.org/about. From that a possible timescale appear...
The stages and timescale for the PeckhamCoDesign process is described in 7 stages on: peckhamcodesign.org/about. From that a possible timescale appear...