Posts by Safetyorganization Bangalore
G&SR 3.80.
Duties of Loco Pilot when an approach Stop signal is
G&SR 3.80. Duties of Loco Pilot when an approach Stop signal is ‘ON’ or defective. – (1) The Loco Pilot of a train shall not pass an Outer, a...
G&SR 3.80. Duties of Loco Pilot when an approach Stop signal is ‘ON’ or defective. – (1) The Loco Pilot of a train shall not pass an Outer, a...
EXCHANGE OF ALL RIGHT SIGNALS
1. ‘All Right Signal’ shall
EXCHANGE OF ALL RIGHT SIGNALS 1. ‘All Right Signal’ shall be exchanged between: a. The train crew (LP/ALP, Guard) and the station staff (SM & P...
EXCHANGE OF ALL RIGHT SIGNALS 1. ‘All Right Signal’ shall be exchanged between: a. The train crew (LP/ALP, Guard) and the station staff (SM & P...
Periodical Rest:
High power Committee report
4.3.6.3
Periodical Rest: High power Committee report 4.3.6.3 Committee’s Views: At present, the Running Staff is given five periodic rests of 22 ...
Periodical Rest: High power Committee report 4.3.6.3 Committee’s Views: At present, the Running Staff is given five periodic rests of 22 ...
ACCIDENT MANUAL
CHAPTER - III
CLASSIFICATION OF ACCIDENTS
ACCIDENT MANUAL CHAPTER - III CLASSIFICATION OF ACCIDENTS Accident: For the purpose of Railway working, accident is an occurrence in the course o...
ACCIDENT MANUAL CHAPTER - III CLASSIFICATION OF ACCIDENTS Accident: For the purpose of Railway working, accident is an occurrence in the course o...
Trending Topics
© 2015