-471 SB FROM THE DANIEL CARTER BEARD BRIDGE/OHIO RIVER IN CAMPBELL - TopicsExpress



          

-471 SB FROM THE DANIEL CARTER BEARD BRIDGE/OHIO RIVER IN CAMPBELL COUNTY TO US 27 IN HIGHLAND HEIGHTS - REVIVE THE DRIVE – NKY · Beginning at 8 PM on Friday September 20th, 2013; traffic restrictions will be in place on I-471 SB to restore the corridor to its normal alignment. Beginning at 10 PM, traffic will be restricted to a single lane beginning on the Daniel Carter Beard Bridge and extending through the I-275 Interchange. Restrictions to a single lane may continue until 6 AM, Monday morning, September 23rd, 2013. Entrance and Exit Ramp traffic throughout the corridor may be impeded for short durations during traffic control and striping operations. Please use caution, REDUCE SPEED, and watch for traffic control devices, personnel and equipment entering and exiting the work zone. · At Exit 1 (I-275/I-471 Interchange), traffic in the RIGHT lane may exit at exit 1B to I-275 westbound, or continue through the interchange to US 27 in Highland Heights. Traffic in the left lane must exit at 1A to I-275 eastbound. Shoulders are also closed in this area. This traffic pattern will continue until further notice. The speed limit through this section is 45 MPH. · Traffic may be further reduced to a single lane during nighttime periods throughout the limits of the project. · Work is being performed along the I-471 SB ramp to I-275 WB. Traffic should use caution in this area and watch for construction vehicles entering and leaving the roadway along this ramp. · Expect delays until this project are completed later this year. · Use caution when traveling through the project and watch for slowed or stopped traffic. Watch for construction vehicles entering and leaving traffic throughout the work zone. The speed limit is reduced through the construction zone and will be enforced. I-275 WB AT THE I-471 INTERCHANGE in Campbell County - REVIVE THE DRIVE – NKY · The right lane on I-275 westbound at the I-275/I-471 Interchange is closed. This closure extends for approximately one-half mile. In addition traffic is in a shifted position with both shoulders closed through this area. This closure will be in place until further notice. · Crews are working along the right shoulder of I-275 WB in this area. Watch for construction vehicles entering and leaving traffic in this area. · Traffic may encounter flagging operations with short delays on Three Mile Road at the I-275 overpass as part of the work being performed in the area adjacent to Three Mile Road.
Posted on: Fri, 20 Sep 2013 14:08:33 +0000

Trending Topics



Recently Viewed Topics




© 2015