FINALLY started my 3-phase project to: i) install Type 9 box ii) - TopicsExpress



          

FINALLY started my 3-phase project to: i) install Type 9 box ii) get engine bay painted iii) complete engine re-build, including cam change. As per attached pic, I have now got the engine out, necessary for all of the above. REGARDING THE THE TYPE 9 INSTALLATION - I know its been written many times before BUT can you please confirm the piece that I need to cut out of the transmission tunnel? I believe its the channel that runs across the car, through which two bolts passed into the original gearbox mount? In my photo of the empty engine bay, its the piece immediately below the heater box. Do I only need to cut out this channel between either side of the transmission tunnel and as such, no sheet metal needs to be removed? Sorry, I know this has been written in many threads before BUT I dont want to get it wrong later today when I go in with the saw...
Posted on: Sun, 11 Jan 2015 09:08:04 +0000

Trending Topics



Recently Viewed Topics




© 2015