Failed QC Friday Conclusion. Good Evening Techs!!! MAKE - TopicsExpress



          

Failed QC Friday Conclusion. Good Evening Techs!!! MAKE SURE YOU MAKE THE PROPER DROP ATTACHMENT..... To ensure you pass each QC, it is crucial to ensure a proper drop connection at the tap along with any bump poles and the home as well. If your system uses drop hanger be sure to use them at every job. If your system uses 2,4,4 method, 4,4,2 method or whatever the case may be, make sure the drop is attached properly and at proper height. By doing this at each job it is just another component you will pass when the job is checked by a QC tech or supervisor as well as prolonging the health of the drop over time. THANK YOU TECHS FOR THE SUPPORT OF CATV-TI!!!!! HAVE A GREAT NIGHT FROM ALL OF US HERE AT CATV-TI!!!!
Posted on: Sat, 03 Jan 2015 04:15:01 +0000

Trending Topics



Recently Viewed Topics




© 2015