Latest Clive St Update During the past week the installation of the tree pits and drainage sumps have been completed following some necessary modification of the sumps. Next week , conduits to cater for electrical wiring and irrigation will be installed. A surveyor will also be onsite checking all levels before the street receives a final grade and primer seal. Asphalt will then be laid over the sealed surface during the following week.