The Pantry, Inc. 305 Gregson Drive Cary, North Carolina - TopicsExpress



          

The Pantry, Inc. 305 Gregson Drive Cary, North Carolina 27511 (919)781-4865 Lrobbins@wyrick thepantry/ N.J.R. Group, Inc. Construction Department Tariq Tony Robinson 5143 Newland Road Warsaw, Virginia 22572 Phone (540) 273-9953 njrgroupinc Wednesday July 10, 2013 11:44pm Eastern McDonald’s Corporation 2111 McDonalds Drive Oak Brook, Illinois 60523 (800)244-6227 The Pantry, Inc. 305 Gregson Drive Cary, North Carolina 27511 (919)781-4865 Lrobbins@wyrick Dear McDonald’s Corporation / Pantry, Inc., I’m working on the main exit road in Richmond, Virginia Located inside Intricate Truck Stop Intricate-(In’Tri kit) Adj. -Having many Perplexingly Entangled Parts or Elements, Complex; Difficult to solve or Understand. You have a main exit road leaving truck stop at Dumbarton Road on the left side of Virginia State Police Barracks. The road is behind Gray’s Papaya and behind N.J.R. Restaurant, And goes around Virginia State Police Barracks. 1613’L x 50’W The main Exit Road 1573’L x 5’W x 3”D Concrete Sidewalk on left side of road 1489’L x 5’W x 3”D Concrete Sidewalk on the right side of the road 1573’L x 20’W x 4”D Landscape area on the Left side of the road 1489’L x 20’W x 4”D Landscape Area on the right side of the road. 8” Road Stones Required for the road. 3” Concrete Required for sidewalks 4” Screen Topsoil Required for Landscape Areas You have 4 intersections that are connected to the main exit road. (1). One way road leaving Gray’s Papaya connecting to the Main Exit Road. (2). One way road leading to N.J.R. Restaurant. Entrance from Main exit road. (3). One way road leaving truck parking lot connecting to main Exit Road. (4). One way road leaving Dumbarton road leading to N.J.R. Restaurant Loading dock. Connecting to Main Exit Road. Demolition Phase Or Project Excavator Name of Product Or Material / Man Power $14,400.00 Cost Of Item Wheel Excavator Name of Product Or Material / Man Power $6,400.00 Cost Of Item Crusher Name of Product Or Material / Man Power $14,400.00 Cost Of Item (2) On-Site Dump Trucks Name of Product Or Material / Man Power $21,600.00 Cost Of Item Safety Truck Name of Product Or Material / Man Power $5,040.00 Cost Of Item Richmond City Police Officer Name of Product Or Material / Man Power $4,800.00 Cost Of Item Safety Name of Product Or Material / Man Power $11,720.00 Cost Of Item Foremen Name of Product Or Material / Man Power $5,760.00 Cost Of Item Shop Stewart Laborers Name of Product Or Material / Man Power $5,040.00 Cost Of Item Shop Stewart Teamsters Name of Product Or Material / Man Power $5,040.00 Cost Of Item Lead Engineer Name of Product Or Material / Man Power $7,200.00 Cost Of Item Foremen Truck Dodge Ram 5500 Crew Cab Name of Product Or Material / Man Power $5,760.00 Cost Of Item Laborers Name of Product Or Material / Man Power $14,560.00 Cost Of Item Operators Name of Product Or Material / Man Power $17,600.00 Cost Of Item Fuel & Lube Name of Product Or Material / Man Power $39,800.00 Cost Of Item Fuel & Lube Truck Name of Product Or Material / Man Power $9,000.00 Cost Of Item Teamsters Name of Product Or Material / Man Power $15,120.00 Cost Of Item Crushed Concrete Name of Product Or Material / Man Power 17,805 Tonnage Accumulated 18 Working Days to Complete Phase $188,820.00 Sub Total $11,329.20 6% Tax $200,150.20 Total $246,183.70 Total cost of Phase with Companies Fees On this phase is the Excavation part of this bid. You Have 1,500’L x 1,475’W Total area 2,212,500’Sq. Feet Total Area 245,833’Sq. Yards Total Area 2,037,900’Sq. Feet of Asphalt that has to be milled, And Taken to the Asphalt Plant to be recycled. 6” (Inches) of Asphalt that has to milled 67,929 Tons Of Millings 8” (Inches) of dirt has to be boxed out in the total area. 14” (Inches) Box for the total Area Excavation Phase Or Project Milling Machine Name of Product Or Material / Man Power $54,400.00 Cost Of Item (12) Dump trucks On Milling crew Name of Product Or Material / Man Power $489,600.00 Cost Of Item Water Truck Cost Name of Product Or Material / Man Power $34,000.00 Cost Of Item Excavator Name of Product Or Material / Man Power $251,200.00 Cost Of Item Roller Name of Product Or Material / Man Power $251,200.00 Cost Of Item Dozer Name of Product Or Material / Man Power $251,200.00 Cost Of Item Sheep Foot Roller Name of Product Or Material / Man Power $251,200.00 Cost Of Item Fuel & Lube Truck Name of Product Or Material / Man Power $34,000.00 Cost Of Item Fuel & Lube Name of Product Or Material / Man Power $1,347,930.00 Cost Of Item (12) Dump Trucks on Excavation Crew Name of Product Or Material / Man Power $2,260,800.00 Cost Of Item Laborers Name of Product Or Material / Man Power $301,840.00 Cost Of Item Operators Name of Product Or Material / Man Power $630,080.00 Cost Of Item Teamsters Name of Product Or Material / Man Power $1,305,280.00 Cost Of Item Shop Stewart Laborers Name of Product Or Material / Man Power $106,960.00 Cost Of Item Shop Stewart Teamsters Name of Product Or Material / Man Power $106,960.00 Cost Of Item Lead Engineer Name of Product Or Material / Man Power $152,800.00 Cost Of Item Foremen Milling Crew Name of Product Or Material / Man Power $21,760.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Name of Product Or Material / Man Power $21,760.00 Cost Of Item Foremen Excavation Crew Name of Product Or Material / Man Power $100,480.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Name of Product Or Material / Man Power $100,480.00 Cost Of Item Dirt Name of Product Or Material / Man Power 603,822 Cubic Yards Of Dirt Accumulated Fill Dirt Name of Product Or Material / Man Power 25,866 Cubic Yards Used for Fill Millings Name of Product Or Material / Man Power $203,787.00 Cost Of Item 382 Working Days to Complete Phase $8,277,717.00 Sub Total 496,663.02 6% Tax $8,774,380.02 Total $10,792,487.42 Total cost of Phase with Companies Fees
Posted on: Thu, 11 Jul 2013 04:01:46 +0000

Trending Topics



Recently Viewed Topics




© 2015