Update from Alex Glenn on his first complete day of work with global brigades in Ghana. Thanks to all who contributed to Alex to make this trip possible for him. ************** Day one of construction done. We poured the foundation. Attached together the mesh wire that makes the cylinder for. Attached the smaller chicken wire to the larger mesh cylinder. Placed the cylinder on the poured foundation. Poured more concrete inside the cylinder. And poured more concrete on the outside of the cylinder. Made a lot of progress! Not to mention, my team (two teams are building the water thanks, one team building a latreen) finished first by like 40 minutes! Now its just relaxing back at the compound. Dinner and six, meeting at 7, and that is all for the day! Love yall lots!