Week of July 8th MOM Groundwater Treatment System Installation - - TopicsExpress



          

Week of July 8th MOM Groundwater Treatment System Installation - Complete pouring of building floor slab - Begin painting/coating system on concrete equipment pads - Continue subsurface piping installation to injection wells and extraction wells - Complete encasement of electrical duct banks - Begin installation of electrical conduits to extraction/injection wells - Unitil to complete wiring of transformer Howard Manor Condominiums - Unitil work is complete, water line complete, and monitoring well installation is complete. - Grassed area near slope has been restored, and grass is beginning to grow. - Shrubs to be planted on slope area - we now have capability to irrigate to assure they take hold. - Well development still in process - one small truck with one worker to pump wells. - Possible preparation work for driveway paving by Pennichuck/American Excavating - Plan to apply green paint to monitoring well covers following completion of well develoment. Noise/Traffic - Diesel engines from construction equipment and trucks - Small gas engines on concrete finishing equipment (e.g. power trowels) - Concrete deliveries on Monday through Main Street entrance (estimated 10-12 truckloads). - One additional concrete delivery during the week for duct banks - Trucks delivering miscellaneous equipment and materials through the Main Street entrance
Posted on: Mon, 08 Jul 2013 06:39:01 +0000

Trending Topics



Recently Viewed Topics




© 2015