Project Home Studio proceeds apace. Today did a Level One floor - TopicsExpress



          

Project Home Studio proceeds apace. Today did a Level One floor sweep, then washed walls and windows clean of cobwebs, dust and dirt with dish soap and water. Tomorrow I get a quote on rewiring the electrics. Then I proceed with mask & breather-wearing cleanse-blast of the room and concrete-floor cracks with leaf blower, followed by total knotty-pine wall reconditioning with lemon oil and towels, followed by deep steel-wire scrub-washing of floor, patching cracks with silicone, washing clean, repainting floor. All of that is Stage One.
Posted on: Sat, 24 Aug 2013 23:51:56 +0000

Trending Topics



Recently Viewed Topics




© 2015