Tod Beall wrote: The Memorial Hall Oversight Committee met - TopicsExpress



          

Tod Beall wrote: The Memorial Hall Oversight Committee met Monday, March 10. Items discussed included the need for improved exterior lighting near the two fire escapes (north & south sides). Photos of two examples were shown but it was felt that they were not appropriate for the age of the building so we will view other examples at our next meeting. Also at the fire exits, we need to upgrade the handrails and improve the paving below the south exit. The bottom of the access ramp on the south side will need to be brought up to code; a bollard will probably be installed at the end of the brick walkway to keep vehicles off of the bricks and to discourage those in wheelchairs from using that route (which is made dangerous by the steep driveway down to the maintenance area). Access must be made from the sidewalk next to Main Street. Also, since the level of the landing pad at the bottom of the ramp will need to be raised, a step or two will be installed leading down to the driveway. The act curtain was removed last week; discussion about a replacement, painted curtain resulted in ideas for research about reproduction painters and appropriate fabrics. Bid specs for the replication of the north emergency exit door and repairs to the main doors will be ready this week. Bid specs for the insulation and sheetrock work in the stage area will be ready this week. At this time, we expect to have the building open for SummerFest on July 4. This means that it will be available for the Craft Fair in November and concerts or plays as well. There may be more work to be completed throughout the rest of the year.
Posted on: Tue, 11 Mar 2014 15:17:10 +0000

Trending Topics



Recently Viewed Topics




© 2015