tried to get a slope of 1:100 as it was on the drawing but used 1:125, the slope continued to be steep of which was not allowed. used theory i learnt from school of eng. @ muk to get total distance over the slope and worked. but that was not enough because i didnot leave the space for liquid gas pipe, and amadi cables for HV transformer terminations.the only distance remaining is 50mm for concrete cover minus plustering and some molding and yet all them are necessary the following engineers should intervene before i make my own decisions , james ashaba , dickens, sina, ashbert,justus rukundo prossie,kamps,ronnie,shirley,..............