उपल्लो हुग्दीखोला - TopicsExpress



          

उपल्लो हुग्दीखोला जलविद्युत् परियोजना रुपाकोट Ru Ru Jalbidhyut Pariyojana Pvt.Ltd. obtained survey license of capacity 5000 KW from Department of Electricity Development (DoED) for development of Upper Hugdi Khola Hydropower Project located at Hugdi Khola of Gulmi district. During feasibility study period of the project, Nepal Electricity Authority has fixed the ceiling for design discharge at 65% probability of exceedence on the basis of which the installed capacity of the project was fixed at 2625kW. After completion of feasibility study and further river flow measurement and exploration of different options to increase the capacity so that financial soundness could be increased. In the mean time, Nepal Electricity Authority has announced to purchase the electricity of those projects which installed capacity is fixed with design discharge at least 40% probability of exceedence which was awaiting policy to the company. Due to formulation of this policy exploitation of potentiality of the river as well as project’s financial soundness could be increased by increasing the power output in marginal increase in project cost. This could make project more feasible in current situation of construction cost increase and stagnant energy price. In this connection, Ruru Jalbidhyut Pariyojana (P) Ltd. has signed the agreement with CEPAD Hydro Consultants (P) Ltd. for upgrading the feasibility study of the project. Immediately after signing of the agreement, the consultant has started to upgrade the capacity of the project as per the changed policy of NEA. The main objectives of study is to upgrade the feasibility study for new installed capacity on the basis of design discharge at least 40% probability of exceedence. Fact Sheet: Developer ratio (70:30) : Sahas Hydro Power Company Limited and existing team of Ru Ru is investing in Source : Hugdi Khola District : Gulmi District Catchments area : 120 Square Kilometer Design Discharge : 3.75 m3 /s in 43.5 percent Excedence flow Gross Head : 184.5 m Net head : 160 m-171.17m Installed Capacity : 5.0 MW (Under Upgrading Process to 6.5 MW) Dry season energy : 5.49 GWh/ year Wet season : 22.77 GWh/year Total energy : 28.26 GWh/year Project Cost : 74.94 Crore Annual Revenue : NRs. 15.54 Crore Access:- Kathmandu to Butwal -260 km (Black topped road) Butwal to Ridhi Bazaar- 63 km (Black topped road)- Ridhi Bazaar to Shantipur Bazaar-34 km (earthen road)- Intake is 300 m downstream of Shantipur Bazaar which is linked with road and all along the head race are very close and parallel to road. Wheeling / Transmission:-Nowadays many projects are not viable due to un availability of grid in Nepal Grid. The existing Bir Bas Sub Station 33/11 kV is 12.5 km apart from our Power Station. Nepal Electricity Authority (NEA) is planning to construct 33/11 kV substation in Majuwa, which is only 2.5 km from our Power Station. Site office is established at Rupakot VDC.
Posted on: Fri, 12 Jul 2013 13:47:38 +0000

Trending Topics



Recently Viewed Topics




© 2015