A lot has happened this past week. The sand for the arenas has been painstakingly spread to an even depth of 2 for the dressage arena and 3 for the jump arena. The cabinets and countertops in the feed rooms and tack rooms have been installed. Water heaters, deep sinks and the washer and dryer have been hooked up. The tile flooring in both bathrooms is now complete. We commissioned another pasture and will have another one ready this week. The road base is in all around the stable and to the arenas as well. Finish grading and the placing of topsoil is well underway in prep for the sod and landscaping. Well post pictures of it all tomorrow. We are planning to open June 1st. :-)
Posted on: Wed, 14 May 2014 03:31:27 +0000