And so ends day #2 _ Logistics Day on the construction - TopicsExpress



          

And so ends day #2 _ Logistics Day on the construction sight......getting the lumber accounted for and laid out, getting the pier and girder lay out done (after the building inspector asked us to change location of one of the pier holes we had to recalculate the girder placement) , had to do an exchange on some lumber the Building Inspector wanted changed out....picked up R-19 insulation and vapor barrier so we could insulate the floor from above during construction (before the subfloor goes in) rather than having to crawl under the building after construction to insulate it......blah, blah, blah....Ready to roll in the morning.
Posted on: Wed, 23 Apr 2014 19:25:23 +0000

Trending Topics



Recently Viewed Topics




© 2015