Back from another day working in the cable locker with Mark R, Christian H, Mark B, John A and Stephen A. There was a little silt to remove from on top of the plates, but it was soon necessary to start unbolting the perforated plates to reveal the silt behind, this was shovelled into buckets and hauled up to the main deck for disposal. This took much of the day, but by the end of it we have all bar two sections clear now, which should not take too long to empty out next week. Once those areas are clear well get a pressure washer in there to remove any residue.
Posted on: Sun, 18 Jan 2015 20:06:24 +0000