Cooper’s Liquor & Deli, Inc. 567 South Orange Ave. Newark, New - TopicsExpress



          

Cooper’s Liquor & Deli, Inc. 567 South Orange Ave. Newark, New Jersey 07103 (973)416-8930 facebook/pages/Coopers-Liquors-Deli-Inc/115818515106702 N.J.R. Group, Inc Construction Department Tariq Tony Robinson 5143 Newland Road Warsaw, Virginia 22572 Phone (540) 273-9953 njrgroupinc Tuesday July 9, 2013 11:51pm Eastern Cooper’s Liquor & Deli, Inc. 567 South Orange Ave. Newark, New Jersey 07103 (973)416-8930 Dear Cooper’s Liquors & Deli, Inc., I have sent you an E-mail about the entire job. Well, this is the entire estimate of the cost of material, Labor, And Company cost. You have: 100’L x 50’W x 20’H the entire building (Concrete Block Structure) 2” x 4” x 12’ Lumber For Interior Walls for Insulation R-19 Insulation for the entire Building 8’ x 4’ Plywood For the roof of the building Shingles 39 3/8” x 13 ¼” For the roof of the building 302’L x 50’W The Park and Order Lot 8” Road Stones on all roads and parking lot 302’L x 50’W x 10’H the roof over the park and Order Lot to protect waitress and waiters 450’L x 50’W The Road in front of Coopers Joining the entrance way @ the intersection of the truck parking lot 402’L x 7’W x 3”H Concrete sidewalk on the right side of the road 3” Concrete for the sidewalks 392’L x 30’W x 4”H Landscape area on the right side of Sidewalk in the middle 4” Screen Top soil in all landscape Areas 30’L x 10’W x 3”H entrance way concrete sidewalk 87’L x 24’W the road on right side of building 111’L x 6”W x 18’H concrete curb on the right side of the road to end property line 402’L x 24’W the road in the rear of building 450’L x 6” x 18”H concrete curb on the right side of the road 87’L x 24’W a road on the left side of building leading to the front 111’L x 6”W x 18”H Concrete curb on the left side of the road at property line Sincerely, Tariq Tony Robinson N.J.R. Group, Inc. Cooper’s Liquors & Deli Building & grading Phase Or Project Back Hoe Name of Product Or Material / Man Power $15,200.00 Cost Of Item Skid Steer Name of Product Or Material / Man Power $15,200.00 Cost Of Item Motor Grader Name of Product Or Material / Man Power $2,400.00 Cost Of Item Dozer Name of Product Or Material / Man Power $2,400.00 Cost Of Item Sheep Foot Roller Name of Product Or Material / Man Power $2,400.00 Cost Of Item Roller Name of Product Or Material / Man Power $2,400.00 Cost Of Item Telehander Name of Product Or Material / Man Power $97,600.00 Cost Of Item Hydraulic Lift Name of Product Or Material / Man Power $97,600.00 Cost Of Item Dump Trucks Name of Product Or Material / Man Power 10 # Of Dump trucks needed for grading crew Dump Trucks Name of Product Or Material / Man Power $18,000.00 Cost Of Item (3) Dump Trucks for landscaping Crew Name of Product Or Material / Man Power $2,400.00 Cost Of Item Water Truck Name of Product Or Material / Man Power $1,500.00 Cost Of Item Fuel Truck Name of Product Or Material / Man Power $63,500.00 Cost Of Item Fuel & Lube Name of Product Or Material / Man Power $256,700.00 Cost Of Item Concrete Forms Truck Name of Product Or Material / Man Power $4,760.00 Cost Of Item R-19 Insulation Name of Product Or Material / Man Power $21,393.36 Cost Of Item Concrete Block 18”L x 8”W x 8”H Name of Product Or Material / Man Power $11,789.40 Cost Of Item Lumber 2”x4”x12’ Name of Product Or Material / Man Power $16,385.84 Cost Of Item Plywood 8’x4’ Name of Product Or Material / Man Power $9,262.11 Cost Of Item Shingles Name of Product Or Material / Man Power $75,821.96 Cost Of Item Concrete Name of Product Or Material / Man Power 1,010 Cubic Yards of Concrete needed Concrete Name of Product Or Material / Man Power $25,250.00 Cost Of Item Screen Top soil Name of Product Or Material / Man Power 1,010 Cubic Yards of topsoil needed Screen Top soil Name of Product Or Material / Man Power $1,362.50 Cost Of Item Road Stones Name of Product Or Material / Man Power 2,349 Tons of Road Stones Needed Road Stones Name of Product Or Material / Man Power $58,725.00 Cost Of Item Foremen Grading Name of Product Or Material / Man Power $960.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Grading Name of Product Or Material / Man Power $960.00 Cost Of Item Foremen Concrete Name of Product Or Material / Man Power $5,440.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Concrete Name of Product Or Material / Man Power $5,440.00 Cost Of Item Foremen Landscaping Name of Product Or Material / Man Power $640.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Landscaping Name of Product Or Material / Man Power $640.00 Cost Of Item Foremen Building Trade Name of Product Or Material / Man Power $33,600.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Building Trade Name of Product Or Material / Man Power $33,600.00 Cost Of Item Foremen Carpenters Name of Product Or Material / Man Power $2,240.00 Cost Of Item Foremen Truck (Dodge Ram 5500 Crew Cab) Carpenters Name of Product Or Material / Man Power $2,240.00 Cost Of Item Shop Stewart Laborers Name of Product Or Material / Man Power $35,560.00 Cost Of Item Shop Stewart Teamsters Name of Product Or Material / Man Power $35,560.00 Cost Of Item Shop Stewart Building Trade Name of Product Or Material / Man Power $35,560.00 Cost Of Item Shop Stewart Carpenters Name of Product Or Material / Man Power $35,560.00 Cost Of Item Lead Engineer Name of Product Or Material / Man Power $50,800.00 Cost Of Item Laborers Name of Product Or Material / Man Power $38,080.00 Cost Of Item Building Trade Laborers Name of Product Or Material / Man Power $118,720.00 Cost Of Item Carpenters Name of Product Or Material / Man Power $10,080.00 Cost Of Item Teamster Name of Product Or Material / Man Power $14,280.00 Cost Of Item Operators Name of Product Or Material / Man Power $112,800.00 Cost Of Item 127 Working Days to Complete Phase $1,374,810.17 Sub Total $82,488.61 6% Tax $1,457,298.78 Total
Posted on: Wed, 10 Jul 2013 04:02:28 +0000

Trending Topics



Recently Viewed Topics




© 2015