Entering the final phase of the 1450sq ft patio remake. Concrete is being poured this morning, will be a combination of exposed aggregate/stamped. Some minor adjustments along the way and a great bonus discovery under the old pool shed - the previous owner (an Engineer) had the forsight to run hot/cold water pipes and a drain(!) under the old interlock back into the house, in addition to the electrical line already in place. So, plans altered to use said pipes and drain and now will include a complete outdoor shower area to rinse off the salt water when finished swimming. Still toying with a possible wet bar down the road... Pool guys will come back on Monday/Tuesday to drop in the new liner and begin filling the pool, re-installing the filter/pump/salt unit and testing everything before shutting it down for the winter...