P Find in the comments below a link to an article from when the - TopicsExpress



          

P Find in the comments below a link to an article from when the spill occurred. The National Energy Board says that more than 5,000 cubic metres of contaminated soil have been trucked out of the Coquihalla Canyon since a pipeline spill last summer, leading a critic to believe the spill was much larger than reported. The volume reported by the NEB would represent removal of almost 600 truckloads of contaminated material from the site. Patrick Smyth, business unit leader with the NEB in Calgary, cited the figure in an email to pipeline critic David Ellis. Ellis questioned the delay in releasing the figure. “The volume says the spill was greater and it’s been under-reported,” Ellis said. “There needs to be a full investigation of this and the NEB should make it public. What went on down there? A pinhole leak or a break?” Kinder Morgan Canada shut down Trans Mountain pipeline last summer due to two spills that were described as minor at the time. In June, a spill occurred near Kingsvale, south of Merritt, followed by a second in the canyon two weeks later. As a result, Kinder Morgan set about repairing the leaks and remediating the sites. All of the contaminated soil was trucked to the Tervita Corporation in Richmond. A hydrostatic pressure test — in which water is pumped through the pipeline at pressures exceeding operational levels — was performed along a 35-kilometre stretch of the pipeline over Thanksgiving. Kinder Morgan said the test was successful. Followup repairs have continued since then, although the 60-year-old pipeline has been operating at 80 per cent pressure, based on an NEB restriction, since then.
Posted on: Sat, 02 Nov 2013 04:36:00 +0000

Trending Topics



Recently Viewed Topics




© 2015