Punta Prima Reform Bedroom finished work included fitting a new roller shutter window blind and new mechanism, full retile to the bedroom floor and throughout the apartment including the hall, bathroom, kitchen, lounge and outside terrace, new internal door and door furniture, architraves in matching wood, new sliding wardrobe doors and architrave to match and bespoke shelving fabricated by Aquaquest Plumbing inside the wardrobe. The whole project with the exception of painting and decorating (that the client undertook themselves) has been completed by David Hudson of Aquaquest Plumbing, electrical works was performed by Steve Burkett of Air Conditioning and Electrical solutions. All materials were supplied at cost with trade discounts and labour costs were less than 3000-00€ for the full reform.