Tub replaced with a shower, Washer and drier hookups, flooring and - TopicsExpress



          

Tub replaced with a shower, Washer and drier hookups, flooring and cupboards installed, and repainted bathroom. One wine and Hunter green bedroom, two coats of primer and two coats of blue and new ceiling. Grey bedroom two coats of blue, wall opened. Four closets painted. Lots of sheet rock repair. DONE!!! Still left to do- Threshold to repair and woodwork to install. We havent done this much on the house all at once since the year we built it.
Posted on: Sun, 09 Mar 2014 02:03:08 +0000

Trending Topics



Recently Viewed Topics




© 2015