Another big week for Col. We ripped out the massive electric fireplace. Nipped down to Hobart and picked up a big stainless range cooker and the cutest(heaviest) cast iron heater Ive ever seen. An Aga little Wenlock. Cols levelled and concreted the base of the fire place. We have bought tile and now its up to me. Col designed a steel box to fit in the fireplace as an extra heat sink. So that all happens later this week. No pressure to tile tomorrow.lol. Plus Col took out the double oven.
Posted on: Mon, 24 Nov 2014 09:00:09 +0000
Trending Topics
Recently Viewed Topics
© 2015