Function of Before Construction 1.Deasibility study 2.Surveying 3.Site investigation 4.Planning 5.Design and drawing 6.Estimating 7.Planning & Schedulind In the begining technical feasibility,environmental impact assessment and economical viability of the project are studied.Surveying includes preparing site plan,cimtour map and measurement of field dimensions and levels.soil investigatio n includes collecting data regarding soil and bearing capacity of soil.soil investigation are done for the purpose of foundation design.On the basis of the data collected planning,designing,are carried out and drawing s are prepared.estimates are prepared to know the probable cost of completion on work and detailed planning and scheduling are prepared to carry out different activities in time without any delay.