Needles, California Weather and - TopicsExpress



          

Needles, California Weather and Traffic: ——————————————————————————————————————————————————————————————————————————————————– ** Weather: ** - Thursday: Mostly sunny, high near 80*F. Light south southeast wind becoming south 10 to 15 mph in the morning. Winds could gust as high as 22 mph. - Thursday Night: Partly cloudy, low around 59*F. South wind 5 to 7 mph. - Friday: Partly sunny, high near 77*F. Calm wind becoming south southwest 5 to 8 mph in the morning. - Friday Night: Partly cloudy, low around 54*F. South southwest wind 5 to 7 mph becoming light and variable in the evening. ——————————————————————————————————————————————————————————————————————————————————– ** More weather information and weather radars are on the National Weather Service website at: ** weather.gov/ ** Weather radar for the Colorado River Tri-State area including for the community of Needles, California is at the National Weather Service website address: ** radar.weather.gov/radar.php?rid=ESX&product=N0R&overlay=11101111&loop=yes ** More weather safety tips and information is at the following National Weather Service website address: ** weather.gov/safety ——————————————————————————————————————————————————————————————————————————————————– ** Traffic: ** **** Micro Surfacing Overlay Seal Project: Day 2: **** - Due to the ongoing micro surfacing overlay seal project, several streets will be closed for micro surfacing overlay seal project. **** List of Dates and Street Closures. Colored mark lines on posted picture of map shows which streets are affected on what day of the project): **** ** On Thursday, November 13th, 2014 (Green Lines: Day 2): ** - Front Street: J Street and F Street in Downtown Needles, California. - F Street: Front Street and West Broadway in Downtown Needles, California. - Front Street: Mid Block of C Street and D Street to Palm Way in Downtown Needles, California. - Third Street: F Street to C Street in Downtown Needles, California. - West Broadway (Outside Lanes): Palm Way to Desnok Street in Downtown Needles, California. ** On Friday, November 14th, 2014 (Yellow Lines: Day 3): ** - Front Street: G Street to F Street in Downtown Needles, California. - West Broadway (All Lanes): A Street to Palm Way in Downtown Needles, California. - East Broadway (Outside Lanes): Desnok Street to Interstate 40 on the southeast side of Needles, California. ** On Monday, November 17th, 2014 (Red Lines: Day 4): ** - West Broadway (All Lanes): A Street to Palm Way in Downtown Needles, California. - West Broadway: J Street to F Street in Downtown Needles, California. - F Street: Front Street to West Broadway in Downtown Needles, California. - West Broadway (Inside Lanes): Desnok Street to Interstate 40 on the southeast side of Needles, California. **** Where All Lanes are indicated above one lane of the street will be closed at a time. **** According to the City of Needles, the project will take place on 4 days; not on Monday, November 10th, 2014 through Sunday, November 30th, 2014 that no parking signs mistakenly stated and re-striping of lines on roads will happen days after the project in completed. Notice flyers of the slurry seal project and road closures have been reportedly sent out flyers to residences and businesses who will be directly impacted by the slurry seal project and road closures. According to a notice flyer from Cooley Construction Inc. provided to ZachNews from the City of Needles, streets will be restricted to traffic, including bicycles, between the hours of 8:00am to 5:00pm PT on scheduled dates listed. Streets have been selected to receive a micro surfacing overlay consists of asphalt emulsion and aggregate that will require up to 3 hours to dry. Residents and businesses are recommended to park on streets not scheduled to be sealed prior to 8:00am PT. Vehicles parked within the posted work areas will be towed out of the way. Once placed, these materials can stain your vehicles, carpets, and floors if driving or walking through before its dry. Please do not wash your vehicle or water your lawns on the days scheduled. Emergency vehicles will have access to all of the streets scheduled to be work on at all times. For your safety, please keep children and animals away from the construction work area is in progress. If the day scheduled for your street is on your normal trash pick up day, please note that we will not impact trash pick up, but trash pick up may be earlier then expected. During the slurry seal project, the portion of roads mentioned will have at least a lane open or a flagger while under construction. Driver should use caution when driving through the construction areas and slow down in the cone zone. No parking signs have been posted and will be towed out of the way if vehicles are parked in the no parking zone. Commuters, residence, and businesses with questions regarding the micro surfacing overlay seal project or street closures can talk with a representative with Cooley Construction Inc. who will be on the job site. Commuters, residence, and businesses with questions regarding the micro surfacing overlay seal project or street closures can also contact the City of Needles at: 1 (760) 326-5740. Contractor inquiries should contact Benjamin Cooley at: 1 (760) 559-0246. ——————————————————————————————————————————————————————————————————————————————————–
Posted on: Thu, 13 Nov 2014 16:54:06 +0000

Trending Topics



Recently Viewed Topics




© 2015