Using the Datapod System you can eliminate the Top 9 mistakes of - TopicsExpress



          

Using the Datapod System you can eliminate the Top 9 mistakes of data center planning, as identified by Data Center Knowledge in a recent article. The mistakes include: Mistake 1: Failure to take total cost of ownership (TCO) into account Mistake 2: Poor cost-to-build estimating Mistake 3: Improperly setting design criteria & performance characteristics Mistake 4: Selecting a site before design criteria are in place Mistake 5: Space planning before design criteria is in place Mistake 6: Designing into a dead-end Mistake 7: Misunderstanding PUE Mistake 8: Misunderstanding LEED certification Mistake 9: Overcomplicated designs
Posted on: Mon, 19 May 2014 04:32:23 +0000

Trending Topics



Recently Viewed Topics




© 2015