ADNAapec NDCS XXIII. Key International Consulting Service - TopicsExpress



          

ADNAapec NDCS XXIII. Key International Consulting Service Collaborations/ Involvements XXIV. Official Development Assistance (ODA) Project Involvements XXV. Participation in the Provision of General Advisory and/or Consulting Services to the Philippine (PH) Government (Ongoing, Recently Completed and Past Consulting Services for Various Public-Private Partnership/ PPP Project or Build-Operate-Transfer/ BOT and Variant Project Proposals) I. Airports, Ports, Inter-modals and Other Transportation Facility Physical Planning and Design Projects IV. Physical Planning with/ without Conceptual Architecture Services for Various Reclamation Projects III. Master Development/ Site Planning Services with/ without Conceptual through Preliminary Architectural Services XXIII. Key International Consulting Service Collaborations/ Involvements 01) PTCC Architect for Cardno (Australia), the commissioned consultant of the DPWH Bureau of Design (BoD) for the Enhancement of Management and Technical Processes for Engineering and Design in the DPWH, Preparation of the Design Guidelines, Criteria and Standards for Public Works & Highways (DGCS) Volume 6 (Public Buildings and Related Structures), 2013 (_.0 person-months); 02) EDCOP Air Transport Planner for Feasibility Study with Master Development Planning (MDP) for the Proposed Expansion of the Caticlan Airport Project (Malay, Aklan Province), January to May 2011 (3.0 months) under the Engineering and Development Corp. of the Ph (EDCOP), associated consultant of the Louis Berger Group (LBG) for the San Miguel Corporation (SMC) group of companies and the Civil Aviation Authority of the Philippines (CAAP); 03) ICF GHK & FISPL Architect for the Pre-investment Studies for the Integrated Transport System Project (ITSP) under the National Economic Development Authority (NEDA) Public-Private Partnership (PPP) Center and the Department of Transportation and Communication (DoTC); (2.0 months); ICF GHK, in association with Feedback Infrastructure Services Private Limited (FISPL), commissioned consultants; 04) SKI Tourism Development Specialist for Pre-Feasibility Study for the Naga River Revitalization Project (Naga City, Camarines Sur Province), a 2010-2011 Asian Development Bank (ADB)-funded study; [approx. 4.0 months for Schema Konsult, Inc. (SKI) in collaboration with ICON GmbH (Germany)], commissioned associated consultants for the Cities Development Initiative for Asia (CDIA); 05) PTCC Project Manager/ Consulting Architect/ Master Planner for Site Development Planning cum Architectural Planning and Design Services for the 21,500.0 SqM portion of the 50,000.0 SqM TGFA Knowles Electronics Corp. (KEC of USA) Project 5.0 has. Greenfield Site Phases 1 and 2 (Electronics Production Plant), 2011 - 2013 (26.0 months) for the PTCC, commissioned consultant of the KEC (USA); 06) Project Manager/ Consulting Architect, Architectural Planning and Design Services for the 1,800.0 SqM TGFA Knowles Electronics Corp. (KEC of USA) Project Brownfield Site Training Facility (for an Electronics Production Plant), 2011 – 2012 (4.0 months); PTCC, commissioned consultant of KEC (USA); 07) AHA-PKII Team Leader (Project Manager/ Architect) for Consulting Services for the Detailed Engineering Design of the New Ministry of Commerce, Industry and Environment Office (MCIEO) Building, Dili, Timor-Leste; under Arch Haus Asia Consultants, Inc. (AHA), year 2014 - 15 (3.0 months) with Philkoei International, Inc. (PKII) for the Government of Timor-Leste; 08) TAMpc Consulting Tourism Planner for Tourism Development Master Planning of the Department of Tourism (DoT) SEMP-Central Philippines Super Region, Philippines (PH); year 2007 (5.0 months) for TAM Planners Co. (TAMpc) for the Department of Tourism (DoT); 09) FDC Consulting Planner for Conceptual (Macro) Land Use Planning for the proposed 53,000.0 hectare expanded Cagayan Special Economic Zone & Freeport (CSEZF) Complex in Gonzaga, Santa Ana and San Vicente, Cagayan Province, Region II, PH; for the Consortium of the Filipinas Dravo Corporation (FDC) and the Landseaire Resources and Management Corporation (LRMC), associated consultants for the Cagayan Economic Zone Authority (CEZA), February-April 1998 (3.0 months); 10) Planning Research and Conceptual Architectural Design for the proposed commercial and mixed-use developments in and around the proposed Light Rail Transit (LRT) System Line No. 2 s Recto-Bilibid terminal, and in LRT Line No. 1s Blumentritt terminal with a combined floor area of approximately seventy thousand square meters (+/-70,000.0 sqm) under the Metropolitan Manila Commission Urban Land Management Study (MMC-ULMS) Program; 1984 (4.0 months) for Electrowatt Engineering Services, Ltd. For the MMC; 11) Pre-Feasibility Study for the proposed Manila International Cargo Terminal (ICT) Project and the Proposed MIAA-NAIA General Aviation Relocation Project (USAID-funded) at Pasay City, Metropolitan Manila, PH; 1994 (4.00 months) for the DCCD Engineering Corporation in association with Daniel, Mann, Johnson and Mendenhall (DMJM) International, commissioned consultant of the Coordinating Council of the Philippine Assistance Program (CCPAP); 12) PTCC Member of the Transaction Advisory Group for Public-Private Partnership (PPP) for the PH Department of Education (DepEd) School Infrastructure Project (PSIP) Under a Build-Lease-Transfer (BLT) Modality, 2012 (1.0 man-month) for Philips’ Technical Consultants Corp. (PTCC), sub-consultant for Ernst & Young (SGV & Co.) as commissioned Transaction Advisor for the PH Government; estimated project cost at PhP12.0 B; 13) PCI Consulting Land Use Planner for the OECF-funded Batangas Port Project Phase II, Batangas Province, Region IV, PH; March-July 1997 (3.50 months) for the ALMEC Corporation and for Pacific Consultants, International (PCI); 14) DACYapc Project Manager for Evaluation of development potentials of government and private properties along Light Rail Transit (LRT) System Lines 1 and 2 as part of the LRT Financial Restructuring Study (FRS) including land and property developments/ redevelopments, Pasay City, Makati City, City of Manila, Quezon City, Marikina City, Metro manila, PH for the Light Rail Transit Authority (LRTA); 1996-1997 (7.0 months); project status : work done by David, Alli, Cruz & Yazon Architects/ Planners Co. (DACYapc) for Joaquin Cunanan Associates in collaboration with Pacific Consultants, International (PCI); project implementation undertaken in phases starting in 1998; 15) SMEC Consulting Urban Designer for Manila North Tollway Corporation/ MNTC Project (C-3, Quezon City to NLEX, Metropolitan Manila Area), 2010 (2.0 months, July through October 2010) under Snowy Mountains Engineering Corp. (SMEC), Ph, commissioned consultant; 16) Consulting Architect/ Planner for Alignment Study for the Proposed 30.0 kilometer (km) Manila South Line Mass Rapid Transit (MSL MRT) Project, April-June 1998 (2.50 months) for the ALMEC Corporation (Japan); project status : project implementation for commencement circa 2002; 17) TAMpc Consulting Architect/ Planner for Tourism Development Master Planning of the Department of Tourism (DoT) SEMP-North Palawan Area including the Preparation of Tourism Standards, Guidelines and Regulations (TSGR), Municipalities of El Nido, Coron, Busuanga, Taytay and Culion, Palawan Province, Region IV, PH; year 2004 - 06 (10.0 months) for TAMpc; 18) FDC Consulting Architect/ Site Planner for Conceptual Architectural Design and Site Planning of the 0.3 hectare Roppongi Property of the Philippine Government in Tokyo, Japan, 1994-1995 (3.50 months) for the Association of Filipinas Dravo Corporation (FDC) and Nihon Sekkei (Tokyo), for the Department of Foreign Affairs (DFA) of the Republic of the Philippines (GOP); actual project cost at about P90.0 M; project status: construction completed and building made operational circa 1999; 19) Pre-Feasibility Study for the proposed Manila International Cargo Terminal (ICT) Project and the Proposed MIAA-NAIA General Aviation Relocation Project (USAID-funded) at Pasay City, Metropolitan Manila, PH; 1994 (4.00 months) for the DCCD Engineering Corporation in association with Daniel, Mann, Johnson and Mendenhall (DMJM) International, commissioned consultant of the Coordinating Council of the Philippine Assistance Program (CCPAP); 20) PCI Consulting Planner for Land Use Planning for the OECF-funded Batangas Port Project Phase II, Batangas Province, Region IV, PH; March-July 1997 (3.50 months) for the ALMEC Corporation and for Pacific Consultants, International (PCI); 21) EDCOP Senior Architect for Feasibility Study with Detailed Master Development Planning (DMDP) and Preliminary Architectural Plan and Design Preparation for the Proposed CEZA-Northern Cagayan International Airport Project (Lal-lo, Cagayan Province), 2010 (4.0 months) under EDCOP, commissioned consultant of Getinsa (Spanish firm); 22) DACYapc Project Manager for Evaluation of development potentials of government and private properties along Light Rail Transit (LRT) System Lines 1 and 2 as part of the LRT Financial Restructuring Study (FRS) including land and property developments/ redevelopments, Pasay City, Makati City, City of Manila, Quezon City, Marikina City, Metro Manila, PH for the Light Rail Transit Authority (LRTA); 1996-1997 (7.0 months); project status : work done for Joaquin Cunanan Associates in collaboration with Pacific Consultants, International (PCI); project implementation undertaken in phases starting in 1998; 23) FDC Consulting Architect for Educational Facilities Planning and Facilities Evaluation for about 900 secondary school sites under Batches 1 and 2 (15.0 provinces) of the Department of Education (DepEd) Secondary Education Development and Improvement Project (SEDIP) School Mapping Exercise (SME) Project; circa 2005 (2.2 mos.) for the Lead Firm Pacific Consultants International (PCI) and under the Filipinas Dravo Corporation (FDC); 24) Consulting Architect/ Planner for Alignment Study for the Proposed 30.0 kilometer (km) Manila South Line Mass Rapid Transit (MSL MRT) Project, April-June 1998 (2.50 months) for the ALMEC Corporation (Japan); project status : project implementation for commencement circa 2002; 25) DCCD Consulting Planner for Pre-Feasibility Study for the Proposed Philippine World Center Project (a proposed joint venture project between PEA and TOYO Construction Co., Ltd. of Japan) at the City of Manila (+/- 150.0 hectares (has.), PH; 1990 (1.5 months) for the DCCD Engineering Corp. in association with JCP Incorporated (Planners, Architects and Consulting Engineers) of Tokyo, Japan for the Coordinating Council of the Philippine Assistance Program (CCPAP); 26) Conceptual Master Plan and Architectural Design for the 14.0 Hectares (has.) Arroceros Central Multi-Modal as part of the Planning Research and Conceptual Architectural Design for the proposed commercial and mixed-use developments in and around the proposed Light Rail Transit (LRT) System Line No. 1 s Arroceros Central Terminal with a combined floor area of approximately one hundred forty thousand square meters (+/-140,000.0 sqm), 1981 for Electrowatt Engineering Services, Ltd. (of Zurich, Switzerland) LRT Line 1 Construction Management Office; and 27) Conceptual Master Plan and Architectural Design for the 7.0 Hectares (Has.) Recto Central Inter-Modal as part of the Planning Research and Conceptual Architectural Design for the proposed commercial and mixed-use developments in and around the proposed Light Rail Transit (LRT) System Line No. 2 s Recto-Bilibid Terminal, and in LRT Line No. 1s Blumentritt terminal with a combined floor area of approximately seventy thousand square meters (+/-70,000.0 sqm) under the MMC-ULMS Program, 1983 - 1984 for Electrowatt Engineering Services, Ltd. (of Zurich, Switzerland) Manila Regional Office. XXIV. Official Development Assistance (ODA) Project Involvements 01) SKI Tourism Development Specialist for Pre-Feasibility Study for the Naga River Revitalization Project (Naga City, Camarines Sur Province), an Asian Development Bank (ADB)-funded study; 2011-2012 (5.0 months) under Schema Konsult, Inc. (SKI) in collaboration with ICON GmbH (Germany), commissioned consultants of the Cities Development Initiative for Asia (CDIA); 02) Consulting Services for the Detailed Engineering Design of the New Ministry of Commerce, Industry and Environment Office (MCIEO) Building, Dili, Timor-Leste; under Arch Haus Asia Consultants, Inc. (AHA), year 2014 - 15 (3.0 months as Team Leader/ Project Manager-Architect) with Philkoei International, Inc. (PKII) for the Government of Timor-Leste; 03) PROS Consulting Planner for Pre-Feasibility Study for the Tourism Development Master Planning for the Province of Bohol, Region VII, PH; 49.0 Municipalities & 1 City; under PROS and Pacific Consultants, International (PCI), year 2006 - 2008 (6.0 months) with PROS; 04) FDC Architect for Construction Management (CM) Services for the Construction of the Philippine Judicial Academy (PHILJA) Complex, Tagaytay City, Cavite Province, PH; 2009-2010 (2.0 years) for the Filipinas Dravo Corp. (FDC) for the Supreme Court of the Philippines (SCP); project status : construction completed and building made operational in 2010; 05) TAMpc Consulting Planner for Tourism Development Master Planning of the Department of Tourism (DoT) SEMP-Central Philippines Super Region, Philippines (PH); year 2007 (5.0 months) for TAM Planners Co. (TAMpc); 06) Pre-Feasibility Study for the proposed Manila International Cargo Terminal (ICT) Project and the Proposed MIAA-NAIA General Aviation Relocation Project (USAID-funded) at Pasay City, Metropolitan Manila, PH; 1994 (4.00 months) for the DCCD Engineering Corporation in association with Daniel, Mann, Johnson and Mendenhall (DMJM) International, commissioned consultant of the Coordinating Council of the Philippine Assistance Program (CCPAP); 07) PCI Consulting Planner for Land Use Planning for the OECF-funded Batangas Port Project Phase II, Batangas Province, Region IV, PH; March-July 1997 (3.50 months) for the ALMEC Corporation and for Pacific Consultants, International (PCI); 08) EDCOP Senior Architect for Feasibility Study with Detailed Master Development Planning (DMDP) and Preliminary Architectural Plan and Design Preparation for the Proposed CEZA-Northern Cagayan International Airport Project (Lal-lo, Cagayan Province), 2010 (4.0 months) under EDCOP, commissioned consultant of Getinsa (Spanish firm); 09) DACYapc Project Manager for Evaluation of development potentials of government and private properties along Light Rail Transit (LRT) System Lines 1 and 2 as part of the LRT Financial Restructuring Study (FRS) including land and property developments/ redevelopments, Pasay City, Makati City, City of Manila, Quezon City, Marikina City, Metro Manila, PH for the Light Rail Transit Authority (LRTA); 1996-1997 (7.0 months); project status : work done for Joaquin Cunanan Associates in collaboration with Pacific Consultants, International (PCI); project implementation undertaken in phases starting in 1998; 10) Consulting Architect/ Planner for Alignment Study for the Proposed 30.0 kilometer (km) Manila South Line Mass Rapid Transit (MSL MRT) Project, April-June 1998 (2.50 months) for the ALMEC Corporation (Japan); project status : project implementation for commencement circa 2002; 11) FDC Consulting Architect/ Site Planner for Conceptual Architectural Design and Site Planning of the 0.3 hectare Roppongi Property of the Philippine Government in Tokyo, Japan, 1994-1995 (3.50 months) for the Association of Filipinas Dravo Corporation (FDC) and Nihon Sekkei (Tokyo), for the Department of Foreign Affairs (DFA) of the Republic of the Philippines (GOP); actual project cost at about P90.0 M; project status: construction completed and building made operational circa 1999; 12) FDC Consulting Architect for Educational Facilities Planning and Facilities Evaluation for about 900 secondary school sites under Batches 1 and 2 (15.0 provinces) of the Department of Education (DepEd) Secondary Education Development and Improvement Project (SEDIP) School Mapping Exercise (SME) Project; circa 2005 (2.2 mos.) for the Lead Firm Pacific Consultants International (PCI) and under the Filipinas Dravo Corporation (FDC); and 13) Consulting Architect and Architect-of- record for the Site Master Planning, Space Planning and Preliminary Architectural Design for the New San Marcelino Public Market (ADB-funded and SBMA-funded) in San Marcelino, Zambales Province, PH; 2001 (3.0 months as) for the FDC, the SBMA and the LGU of San Marcelino, Zambales; +/- 6,000.0 sqm, 2001-2001, estimated project cost at about P54.0 M; project status : construction completed and building operational. XXV. Participation in the Provision of General Advisory and/or Consulting Services to the Philippine (PH) Government (Ongoing, Recently Completed and Past Consulting Services for Various Public-Private Partnership/ PPP Project or Build-Operate-Transfer/ BOT and Variant Project Proposals) 01) ICF GHK & Rebel Group Architect for the Feasibility Study for the Regional Prison Facility (RPF) under the National Economic Development Authority (NEDA) Public-Private Partnership (PPP) Center and the Department of Justice (DoJ); (2.0 months); ICF GHK, in association with Rebel Group, commissioned consultants; 02) IMC Member of the Transaction Advisory Group for Public-Private Partnership (PPP) for the PH Department of Education (DepEd) School Infrastructure Project (PSIP) II (approx. 10,000 classrooms) Under a Build-Transfer (BT) Modality, 2013 (1.5 person-months) for IMC as commissioned Transaction Advisor (TA) for the PH Government; 03) Team Member (Architect) of ICF GHK, in association with Feedback Infrastructure Services Private Limited, the consulting association commissioned by the PH Government to implement the transaction advisory/ pre-investment studies for the Integrated Transport System Project (ITSP) under the National Economic Development Authority (NEDA) Public-Private Partnership (PPP) Center and the Department of Transportation and Communication (DoTC); 4.0 person-months as Architect; 04) PTCC Member of the Transaction Advisory (TA) Group for Public-Private Partnership (PPP) for the PH Department of Education (DepEd) School Infrastructure Project (PSIP) (approx. 10,000 classrooms) Under a Build-Lease-Transfer (BLT) Modality, 2012 (1.5 man-months) for Philips’ Technical Consultants Corp. (PTCC), sub-consultant for Ernst & Young (SGV & Co.) as commissioned Transaction Advisor (TA) for the PH Government; estimated project cost at PhP12.0 B; 05) Physical Planning and/or Terminal Architectural Concept Design for Various Airport Development/ Redevelopment Projects of the Department of Transportation and Communications (DoTC) in Caticlan (Aklan Province, as Air Transport Planner), Kalibo (Aklan Province, as Project Manager and Airport Planner), Libmanan (Camarines Sur Province, as Project Manager and Airport Planner), Lal-lo (Cagayan Province, as Senior Architect), Maddela (Quirino Province, as Senior Architect) and the New International Cargo Terminal (NICT, as Project Manager and Architect/ Master Planner) at the NAIA Complex (a 2011 PPP project) in the Metropolitan Manila Area (MMA/ NCR); 2008 through 2012 for the Philip’s Technical Consultants Corp. (PTCC) and the Engineering and Development Corp. of the Ph (EDCOP); 06) EDCOP Air Transport Planner for Physical Planning for the Caticlan Airport Project for the Civil Aviation Authority of the Philippines (CAAP) and its Concessionaire, the San Miguel Corporation (SMC) group of companies, (approx. 2.0 months for EDCOP); 07) SKI Tourism Development Specialist for Pre-Feasibility Study for the Naga River Revitalization Project (Naga City, Camarines Sur Province), a 2010-2011 Asian Development Bank (ADB)-funded study; [approx. 4.0 months for Schema Konsult, Inc. (SKI) in collaboration with ICON GmbH (Germany)], commissioned associated consultants for the Cities Development Initiative for Asia (CDIA); 08) SMEC Consulting Urban Designer for Manila North Tollway Corporation/ MNTC Project (C-3, Quezon City to NLEX, Metropolitan Manila Area), 2010 (2.0 months, July through October 2010) under Snowy Mountains Engineering Corp. (SMEC), commissioned consultant; 09) FDC Consulting Architect for Conceptual through Detailed Site Planning and Architectural Design for the proposed 95.0 kilometer (km) Tarlac-Pangasinan-La Union Expressway (TPLEx) Project, 2008 (8.0 months) for the Filipinas Dravo Corp. (FDC), commissioned consultant; project status : project implemented circa 2010 (and targeted for completion in 2013); 10) DACYapc Project Manager for Evaluation of development potentials of government and private properties along Light Rail Transit (LRT) System Lines 1 and 2 as part of the LRT Financial Restructuring Study (FRS), Pasay City, Makati City, City of Manila, Quezon City, Marikina City, Metro Manila, PH for the Light Rail Transit Authority (LRTA); 1996-1997 (7.0 months) for Cunanan & Associates/ Price Waterhouse; estimated project cost at P520.0 M; project status : project implementation undertaken in phases starting in 1998; 11) Consulting Planner for Pre-Investment Study for a proposed 20.0 kilometer (km) toll road project between the CALABARZON Provinces of Laguna and Cavite Provinces, Region IV, PH; 1994-1995 (2.50 months) for Landpros Corp.; project status : construction completed circa 1998; 12) FDC Consulting Architect/ Planner for Feasibility Study for the proposed 49.0 kilometer (km) Circumferential Road 6 (C-6) Tollway Project and its development corridor to be located between Muntinlupa City, Metropolitan Manila and Meycauayan, Bulacan Province, 1993-94 (3.0 months) for the Filipinas Dravo Corporation (FDC) and the Ph national Construction Corp. (PNCC)-Citra Consortium; 13) FDC Consulting Planner for Pre-Feasibility Study for the proposed 162.0 kilometer (km) North Luzon Tollway Extension (NLTE) Project and its development corridor to be located between Sta. Ines, Pampanga and San Fernando, La Union Province, Region I, PH; 1996 (1.50 months) for the Filipinas Dravo Corporation (FDC); 14) FDC Consulting Planner for Pre-Feasibility Study for the proposed 15.0 kilometer (km) Metro Manila Skyway (MMS) Project located above the South Luzon Expressway (SLEX) between Bicutan, Parañaque City and Sen. Gil Puyat (Buendia) Ave., Makati City, Metropolitan Manila, PH; 1994 (1.5 months) for the Filipinas Dravo Corporation (FDC) and PNCC-Citra Consortium; initially estimated project cost at about P5,500.0 M (excluding ROW acquisition); project status : construction completed and project made operational circa 1999; 15) FDC Consulting Architect/ Planner for Pre-Investment/ Pre-Feasibility Studies for the proposed land use conversion i.e. elevated tollway, housing for 18,000.0 families and or about 90,000.0 residents and ancillary developments, on a 16.0 kilometer (km) section of the Philippine National Railway (PNR) right-of-way (ROW) in Metro Manila with an aggregate land area of seventy six hectares (76.0 has.), 1995-1996 (4.0 months) for Landseaire Resources Mgmt. Corp. (LRMC); estimated project cost at about P240.0 M; project status : project partially implemented in 1997-98 but using a vastly different master plan evolved by project proponent New San Jose Builders Corp.; 16) Consulting Architect/ Planner for Alignment Study for the Proposed 30.0 kilometer (km) Manila South Line Mass Rapid Transit (MSL MRT) Project, April-June 1998 (2.50 months) for the ALMEC Corporation (Japan); project status : project implementation for commencement circa 2002; and 17) FDC Consulting Architect/ Site Planner for Conceptual Architectural Design and Site Planning of the 0.3 hectare Roppongi Property of the Philippine Government in Tokyo, Japan, 1994-1995 (3.50 months) for the Association of Filipinas Dravo Corporation (FDC) and Nihon Sekkei (Tokyo), for the Department of Foreign Affairs (DFA) of the Republic of the Philippines (GOP); actual project cost at about P90.0 M; project status: construction completed and building made operational circa 1999. I. Airports, Ports, Inter-modals and Other Transportation Facility Physical Planning and Design Projects 01) PTCC Project Team Leader and Architect/ Master Planner for Feasibility Study for the 96,000.0 SqM TGFA NAIA New International Cargo Terminal (NICT) Project, 2010 (2.5 months); Philipp’s Technical Consultants Corporation (PTCC), commissioned consultant for Ernst & Young (SGV); 02) PTCC Consulting Architect/ Airport Planner for Feasibility Study for the Proposed Kalibo Airport Expansion Project (Aklan), 2010 (4.0 months) under PTCC for Par Excellance, commissioned consultant of the Department of Transportation and Communications (DoTC); 03) EDCOP Air Transport Planner for Feasibility Study with Master Development Planning (MDP) for the Proposed Expansion of the Caticlan Airport Project (Malay, Aklan Province), January to May 2011 (3.0 months) under the Engineering and Development Corp. of the Ph (EDCOP), associated consultant of the Louis Berger Group (LBG) for the San Miguel Corporation (SMC) group of companies and the Civil Aviation Authority of the Philippines (CAAP); 04) Consulting Architect for Oversight for Detailed Master Development Planning (DMDP) and Detailed Architectural and Engineering Design (DAED) for the Proposed Expansion of the Diosdado Macapagal International Airport (DMIA) International Passenger Terminal (IPT) Expansion Project (Clark Field, Pampanga Province), 2011 (1.0 month) for Asset Builders Corp. in collaboration with Arch Haus Asia, Inc. (AHAI) as Design-Build Proponents (Bidders) for the DoTC Clark International Airport Corporation (CIAC); 05) EDCOP Senior Architect for Feasibility Study with Detailed Master Development Planning (DMDP) and Preliminary Architectural Plan and Design Preparation for the Proposed CEZA-Northern Cagayan International Airport Project (Lal-lo, Cagayan Province), 2010 (4.0 months) under EDCOP, commissioned consultant for Getinsa (Spanish firm); 06) EDCOP Senior Architect for Site Planning and Conceptual Architectural Plan and Design Preparation for the Pre-Feasibility Study for the Proposed CEZA-Northern Cagayan International Airport Project (Lal-lo, Cagayan Province), 2008-09 (4.0 months) under EDCOP (with PTCC), commissioned consultant for the DoTC; 07) PTCC Project Manager/ Airport Planner for the Feasibility Study for the Proposed Naga City Airport Expansion Project (Camarines Sur), 2013 (4.0 months) under the Association of PTCC-EDCOP & PRIMEX, commissioned consultants for the DoTC; 08) PTCC Project Manager/ Airport Planner for Feasibility Study for the Proposed Libmanan Airport Project (Camarines Sur), 2010 (4.0 months) under PTCC, commissioned consultant; 09) EDCOP Senior Architect for Feasibility Study for the Proposed Maddela Airport Project (Qurino Province), 2009-10 (3.0 months) under EDCOP, commissioned consultant for the DoTC; 10) Project Manager/ Airport Planner) for the Association of PTCC-EDCOP & PRIMEX in the conduct of the Feasibility Study for the Proposed Naga City Airport Expansion Project (Camarines Sur), 2013 (4.0 months); 11) Consulting Architect for Pre-Feasibility Study for the proposed Manila International Cargo Terminal (ICT) Project and the Proposed MIAA-NAIA General Aviation Relocation Project (USAID-funded) at Pasay City, Metropolitan Manila, PH; 1994 (4.00 months) for the DCCD Engineering Corporation in association with Daniel, Mann, Johnson and Mendenhall (DMJM) International for the Coordinating Council of the Philippine Assistance Program (CCPAP); 12) SPI Assistant Project Manager for Master Development Planning of the Proposed Clark Air Base Civil Aviation Complex International Passenger Terminal (+/- 50,000.0 sqm) and the International Container Terminal (+/- 90,000.0 sqm), together with their respective building grounds totalling some 1,000.0 hectares (has.); Shellink Planners, Inc. (SPI) for the Consortium of SGV & Co., DCCD Engineering Corp. & SPI, commissioned consultants of the Legislative-Executive Bases Council (LEBC) of the Government of the Republic of the Philippines (GRP); 1989-1990 (2.0 years of part-time engagement in-office); 13) Master Development Planning for Philippine Ports Authority (PPA) Nine (9) Southern Luzon Ports i.e. a. Ports of Coron, Culion and Dumaran (Palawan Province), b. Ports of Bauan & San Juan (Batangas Province), c. Ports of Calapan (Mindoro Oriental Province), Bulan (Sorsogon Province), Balanacan (Marinduque Province) and Mandaon (Masbate Province); 2013 - 14 (Project Manager/ Port Planner); project status : project commenced February 2013 under PTCC, commissioned consultant; 14) PCI Consulting Land Use Planner for the OECF-funded Batangas Port Project Phase II, Batangas Province, Region IV, PH; March-July 1997 (3.50 months) for the ALMEC Corporation and for Pacific Consultants, International (PCI); 15) PTCC Project Manager for Detailed Master Development and Operational Planning for the proposed Philippine Ports Authority (PPA) Passenger Terminal Complex (PTC) Project and Detailed architectural and engineering (DA) design, detailed allied design (AD) and the conduct of the Initial Environmental Examination (IEE) study for the proposed three (3.0)-storey PPA Passenger Terminal Building (PTB) Project in the Port of Cagayan de Oro (CDO) City, Misamis Oriental, Region X, Mindanao; 3.0 mos. as Project Manager for the Philip’s Technical Consultants Corp. (PTCC), commissioned consultant of the PPA; 16) ICF GHK & FISPL Architect for the Pre-investment Studies for the Integrated Transport System Project (ITSP) under the National Economic Development Authority (NEDA) Public-Private Partnership (PPP) Center and the Department of Transportation and Communication (DoTC); (2.0 months); ICF GHK, in association with Feedback Infrastructure Services Private Limited (FISPL), commissioned consultants; 17) DACYapc Consulting Planner for Conceptual Masterplan and Architectural Design for the 5.0 Hectares (Has.) PEA CBP-IA South Inter-modal Project as part of the Detailed Master Development Planning (MDP) and Limited Land Use, Transportation and Environmental Analyses (LLUTEA)/ Studies for the Development of the 50.0-hectare (has.) property share of the Public Estates Authority (PEA) at the Central Business Park Island A [CBP-I(A)] portion of the Bay City (old Boulevard 2000) Project, 2001 for David, Alli, Cruz & Yazon Architects/Planners Co. (DACYapc) for the Association of SGV Consulting, DACYapc & DCCD Engineering Corp., commissioned consultants of the Public Estates Authority (PEA); 18) FDC Consulting Planner for Conceptual Master Redevelopment Planning for the proposed redevelopment of the 18.0 hectares (has.) Caloocan City Diocesan Property (Portion of the La Loma Catholic Cemetery Area) into the Northern Metro Manila Multi-Modal, site along Circumferential Road 3 (C-3) in Caloocan City, PH; 2003 (1.0 month), for the Filipinas Dravo Corporation (FDC); 19) SPI Consulting Planner for Conceptual Masterplan for the 8.0 Hectares (Has.) North Inter-modal Project as part of the Conceptual Development Master Planning and Conceptual Architectural Design for the proposed North EDSA Mixed-Use Development Project (+/-150,000.0 sqm), Quezon City, PH and grounds totaling some 40.0 hectares (has.); client was DCCD Engineering corporation for the National Housing Authority (NHA) and the Quezon City Government; 1989 (1.5 months of part-time engagement); 20) Conceptual Master Plan and Architectural Design for the 7.0 Hectares (Has.) Recto Central Inter-Modal as part of the Planning Research and Conceptual Architectural Design for the proposed commercial and mixed-use developments in and around the proposed Light Rail Transit (LRT) System Line No. 2 s Recto-Bilibid Terminal, and in LRT Line No. 1s Blumentritt terminal with a combined floor area of approximately seventy thousand square meters (+/-70,000.0 sqm) under the MMC-ULMS Program, 1983 - 1984 for Electrowatt Engineering Services, Ltd. (of Zurich, Switzerland) Manila Regional Office; 21) Conceptual Master Plan and Architectural Design for the 14.0 Hectares (has.) Arroceros Central Multi-Modal as part of the Planning Research and Conceptual Architectural Design for the proposed commercial and mixed-use developments in and around the proposed Light Rail Transit (LRT) System Line No. 1 s Arroceros Central Terminal with a combined floor area of approximately one hundred forty thousand square meters (+/-140,000.0 sqm), 1981 for Electrowatt Engineering Services, Ltd. (of Zurich, Switzerland) LRT Line 1 Construction Management Office; and 22) DACYapc Project Manager for Evaluation of development potentials of government and private properties along Light Rail Transit (LRT) System Lines 1 and 2 as part of the LRT Financial Restructuring Study (FRS) including land and property developments/ redevelopments, Pasay City, Makati City, City of Manila, Quezon City, Marikina City, Metro manila, PH for the Light Rail Transit Authority (LRTA); 1996-1997 (7.0 months); project status : work done by David, Alli, Cruz & Yazon Architects/ Planners Co. (DACYapc) for Joaquin Cunanan Associates in collaboration with Pacific Consultants, International (PCI); project implementation undertaken in phases starting in 1998. IV. Physical Planning with/ without Conceptual Architecture Services for Various Reclamation Projects 01) FDCceac Architect/ Planner for Feasibility Study Relating to the Reclamation of the Proposed 6-Island/ 600.0 hectares (has.) Laguna Lake West Foreshore Reclamation Project (LLWFRP), 2013 - 2014 (2.0 man-months), a joint DPWH-REID Project for the Laguna Lake Development Authority (LLDA) and the LGUs of Taguig City, Parañaque City & Muntinlupa City, a PPP project in support of the Manila Calmba Expressway Project of the DPWH & DoTC-TRB; 02) FDC Architect/ Planner for Feasibility Study Relating to the Revision of the Preliminary Master Development Plan (MDP) for the Proposed 148.0 hectares (has.) Manila Goldcoast Reclamation Project (MGRP), 2012 (1.0 man-month) for the Filipinas Dravo Corporation (FDC) for the Manila Goldcoast Development Corp. (MGDC); 03) FDC Architect/ Planner for Feasibility Study Relating to the Update/ Revision of the Conceptual through Preliminary Master Development Plan (MDP) for the Proposed 106.0 hectares (has.) World Manila Bay Reclamation Project (WMBRP), 2012 (2.0 man-months) for the FDC, commissioned consultant; 04) FDC Sub-consultant for Planning for Updating/ Revision of the Conceptual through Preliminary Master Development Plan (MDP) for the Proposed 161.0 hectares (has.) Manila Goldcoast Reclamation Project (MGRP), 2011 (3.0 weeks) for the FDC, commissioned consultant; 05) PRA Physical Planning Consultant for Property Development Brief preparation for four (4) Reclaimed Properties of the Philippine Reclamation Authority (PRA) Along the Coastal Road, totaling +/- 8.0 hectares (has.) in surface area, 2010 (2.0 months); 06) DACYapc Project Manager for Detailed Master Development Planning (MDP) and Limited Land Use, Transportation and Environmental Analyses (LLUTEA)/ Studies for the Development of the 50.0-hectare (has.) property share of the Public Estates Authority (PEA) at the Central Business Park Island A [CBP-I(A)] portion of the Bay City (old Boulevard 2000) Project (estimated project cost at P3,000.0 M); project status : bidding for parcellarized portions of the property undertaken circa early 2001; Pasay City, PH; 07) FDC Consulting Planner for Conceptual Master Development Planning (CMDP) of the proposed 217.0 hectare Davao City Reclamation Project on which shall pass the proposed Davao City coastal road and the proposed Metro-Davao LRT system, 1996 (2.0 months) for the Filipinas Dravo Corporation (FDC); 08) DCCD Consulting Planner for Pre-Feasibility Study for the Proposed Philippine World Center Project (a proposed joint venture project between PEA and TOYO Construction Co., Ltd. of Japan) at the City of Manila (+/- 150.0 hectares (has.), PH; 1990 (1.5 months) for the DCCD Engineering Corp. in association with JCP Incorporated (Planners, Architects and Consulting Engineers) of Tokyo, Japan for the Coordinating Council of the Philippine Assistance Program (CCPAP); and 09) SPI Project Manager and Architect/ Planner for the Conceptual Development Master Planning and Conceptual Architectural Design for the proposed North EDSA Mixed-Use Development Project (+/-150,000.0 sqm), and grounds totaling some 40.0 hectares (has.); client was DCCD Engineering Corp. for the National Housing Authority (NHA) and the Quezon City Government; 1989 (1.5 months of part-time engagement). III. Master Development/ Site Planning Services with/ without Conceptual through Preliminary Architectural Services 01) FDC Architect/ Urban Planner for Consulting Services for the Master Development Plan for the Entire Government Arsenal (GA) Industrial Estate of the Armed Forces of the Philippines (Bataan Province); 2014-15 (8.0 months) for the Filipinas Dravo Corp. (FDC); 02) Detailed Master Planning for Fort del Pilar (FDP), home of the Philippine Military Academy (PMA) in Loakan, Baguio City, PH; 2014-15 (8.0 months as Consulting Architect-Planner) for the Filipinas Dravo Corp. (FDC); 03) WCI Project Manager (Team Leader) for Consultancy Services for the Conduct of the Feasibility Study for “THE PLAZA” (with 12,000 seat Coliseum) of the City Government of Calamba (Laguna Province); 2013 (4.0 months) for Woodfields Consultants, Inc. (WCI); 04) DACYapc Project Manager and Architect/ Planner for Conceptual master/ site development planning and conceptual architectural design for the Proposed four hectare (4.0 has.) and the seven (7.0) tower/ 460,000.0 Sq.M. Elsol Development Project, Quezon City, Metropolitan Manila, Philippines (PH); 2007 (1.0 month) for the Filipinas Dravo Corp. (FDC); 05) DACYapc Project Manager and Architect/ Planner for Preparation of a Property Development Brief for the Proposed thirteen hectare (13.0 has.) RCJ Property Development Project, Quezon City, Metropolitan Manila, PH; 2007 (1.0 month) for the FDC; 06) Consulting Architect for Conceptual Architectural Design for the proposed 4-level Residence, Cebu City, Region VI, PH; 2007-2008 (6 months for private client MA Po); 07) DACYapc Project Manager and Architect/ Planner for Conceptual master/ site development planning and conceptual architectural design for the Proposed ten hectare (10.0 has.) and the seventeen (17.0) tower/ 560,000.0 Sq.M. Stone Bay Development Project, Quezon City, Metropolitan Manila, PH; 2006 - 2007 (2.0 months) for DACYapc for the Consortium led by Semper and DCCD Engineering Corp.; 08) Consulting Architect/ Planner for Conceptual Master Redevelopment Planning for the proposed 6.0 hectares (has.) Eurotown Commercial Complex, Municipality of Imus, Cavite Province, Region IV, PH; 2005 (1.5 months), for Plus Builders Corporation (PBC); 09) FTSI Consulting Architect and Property Planner for the architectural design development of a 1.0 hectare mixed-use development project (21.0 storeys) along Nivel Hills, Cebu City, 1996 (0.75 month) for Filbuild Technical Services, Inc. (FTSI); 10) Consulting Architect/ Planner for the conduct of feasibility studies for the proposed development of a combined fifty four hectares (54.0 has.) of mixed-use development projects in Bulacan Province, 1994-1995 (2.50 months) for HGL Philstar Realty; 11) FDC Consulting Architect/ Planner for the proposed development of a six hectare (6.0 has.) special-use facility project in Bataan Province, 1994-1995 (1.50 months) for FDC; 12) Consulting Architect-Urban Designer for the proposed Rotary International (RI) District 3780 Metal Flagstands Project around the Quezon Memorial Circle in Quezon City, 2000-01 (2.0 months for RC2K); 13) EDCOP Air Transport Planner for Feasibility Study with Master Development Planning (MDP) for the Proposed Expansion of the Caticlan Airport Project (Malay & Nabas, Aklan Province), 2011 (3.0 months) under EDCOP, associated consultant of the Louis Berger Group (LBG), commissioned by the San Miguel Corporation (SMC) group of companies and the Civil Aviation Authority of the Ph (CAAP); and 14) EDCOP Consulting Architect/ Environmental Planner for Conceptual Master Development Planning of the Sabang, Baler Eco-Tourism Complex, 2009 - 2010 (3.0 months); EDCOP, commissioned consultant.
Posted on: Sun, 08 Jun 2014 14:27:37 +0000

Trending Topics



Recently Viewed Topics




© 2015