QRSV: the high turbidity level of water supply from IPO DAM has - TopicsExpress



          

QRSV: the high turbidity level of water supply from IPO DAM has forced us to temporarily reduce our water production. this is to ensure the potability of our water supply. as a result, our customers in highly elevated areas and cavite will experience reduced water pressure or unscheduled water interruptions. we are steadily increasing our water production as the turbidity level imoroves. we expect water pressure and supply to gradually improve by 4am tommorow. we apologize for the inconvenience. A MESSAGE FROM MAYNILAD.
Posted on: Sat, 31 Aug 2013 11:25:45 +0000

Recently Viewed Topics




© 2015