.... "Synopsis: Added: Dec 28, 2012 8:41 am The U.S. Army Corps of - TopicsExpress



          

.... "Synopsis: Added: Dec 28, 2012 8:41 am The U.S. Army Corps of Engineers, Europe District (USACE EUD), plans to enter into a firm-fixed-price (FFP), design-bid-build (DBB) construction contract to finish a 6,000 sq. meter space located below grade (i.e. basement) in an existing building. The upper floors of the building are currently occupied and will continue to be occupied during construction. The finishing work includes architectural work (interior walls, floors, doors, etc.), mechanical work (generators, UPS, HVAC, crane, elevator), electrical work, fire protection (fire detection systems, fire extinguishing systems), waterproofing, and a building management system. "The proposed facility construction will be administered under Foreign Military Sales (FMS) and United States procurement laws and regulations. The contract will be awarded and paid in U.S. Dollars. This procurement is restricted to United States firms only, in accordance with 41 U.S.C 421, 48 C.F.R. Chapter 1, FAR 6.302-4, and DFARS Part 225. Contractors participating in this solicitation must be U.S. firms. Any joint-venture must be with another U.S. firm." https://fbo.gov/index?s=opportunity&mode=form&tab=core&id=50da793f62752184fe29a1a2c2bfbcad&_cview=0
Posted on: Wed, 04 Sep 2013 01:36:15 +0000

Trending Topics



Recently Viewed Topics




© 2015