*********DAILY LOADING REPORT********* MV - TopicsExpress



          

*********DAILY LOADING REPORT********* MV “DUNFENG MANILA“ Voy. No.: 1401 SRMI., La Fraternidad Tubay, Agusan del Norte Phil’s. Loading anchorage 1) REPORT UPDATE @ 0700H 03/08/14 (OFFICIAL) Cargo to be Loaded: 152,100.00 WMT Today: 4,116.00 MT. Previous: 142,570.00 MT. Todate: 146,686.00 MT. Balance: 5,414.00 MT. T/Loads: 195 ADTs T/Factor: 21.11 MT. 2) DETAILS / LOADING REPORT AS ATTACH FOR FINAL & OFFICIAL STATEMENT OF FACTS. 7th March, 2014 – Friday 0700 Hrs. – Daily draft survey conducted by ITS Surveyor & Vessel Chief officer. 0700 – 0850 Hrs. – Continuous loading operation CH3, 1 CB operation. 0850 – 0855 Hrs. – Barge Bagac moored, alongside & positioning to CB Galaxy-II Starboard side with 18TL / Cargo material can test conducted by Vessel Duty Officer. 0855 Hrs. – Cargo passed / Resumed loading operation CH1 using CB Galaxy-II from Barge Bagac. 0855 – 0910 Hrs. – Continuous loading operation CH3&1, 2 CB operations. 0910 – 0915 Hrs. – Barge VNG-II finished unloading / Unmoored, cast off for beaching. 0915 – 1040 Hrs. – Continuous loading operation CH1, 1 CB operation. 1040 – 1045 Hrs. – Barge Bagac finished unloading / Unmoored, cast off for beaching. 1045 – 1140 Hrs. – No barge on shipside / Awaiting cargo. 1140 – 1145 Hrs. – LCT GF-101 moored, alongside & positioning to CB Galaxy-II Starboard side with 60TL / Cargo material can test conducted by Vessel Duty Officer. 1145 Hrs. – Cargo passed / Resumed loading operation CH1 using CB Galaxy-II from LCT GF-101. 1145 – 1345 Hrs. – Continuous loading operation CH1, 1 CB operation. 1345 Hrs. – CB Galaxy-I pulled out due to Mechanical trouble. 1345 – 1410 Hrs. – Continuous loading operation CH1, 1 CB operation. 1410 Hrs. – Rain started. 1410 – 1430 Hrs. – Rain / All cargo holds closed / 1 barge on shipside. 1430 Hrs. – Rain stopped / Resumed loading operation CH1 using CB Galaxy-II from LCT GF-101. 1430 – 1525 Hrs. – Continuous loading operation CH1, 1 CB operation. 1525 – 1530 Hrs. – LCT GF-101 finished unloading / Unmoored, cast off for beaching. 1530 – 1535 Hrs. – LCT GF-102 moored, alongside & positioning to CB Fortune-I Portside with 60TL / Cargo material can test conducted by Vessel Duty Officer. 1535 Hrs. – Cargo passed / Resumed loading operation CH6 using CB Fortune-I from LCT GF-102. 1535 – 1715 Hrs. – Continuous loading operation CH6, 1 CB operation. 1715 Hrs. – Rain started. 1715 – 1750 Hrs. – Rain / All cargo holds closed / 1 barge on shipside. 1750 Hrs. – Rain stopped / Resumed loading operation CH6 using CB Fortune-I from LCT GF-102. 1750 – 2125 Hrs. – Continuous loading operation CH6, 1 CB operation. 2125 – 2130 Hrs. – Barge Cluisa moored, alongside & positioning to CB Galaxy-II Starboard side with 20TL / Cargo material can test conducted by Vessel Duty Officer. 2130 Hrs. – Cargo passed / Resumed loading operation CH9 using CB Galaxy-II from Barge Cluisa. 2130 – 2135 Hrs. – Continuous loading operation CH6&9, 2 CB operations. 2135 – 2140 Hrs. – LCT GF-102 finished unloading / Unmoored, cast off for beaching. 2140 – 2310 Hrs. – Continuous loading operation CH9, 1 CB operation. 2310 – 2315 Hrs. – Barge Cluisa finished unloading / Unmoored, cast off for beaching. 2315 – 2320 Hrs. – Barge Milagros moored, alongside & positioning to CB Fortune-I Portside with 20TL / Cargo material can test conducted by Vessel Duty Officer. 2320 Hrs. – Cargo passed / Resumed loading operation CH9 using CB Fortune-I from Barge Milagros. 2320 – 2400 Hrs. – Continuous loading operation CH9, 1 CB operation. 8th March, 2014 – Saturday 0000 – 0120 Hrs. – Continuous loading operation CH9, 1 CB operation. 0120 – 0125 Hrs. – Barge Milagros finished unloading / Unmoored, cast off for beaching. 0125 – 0700 Hrs. – No loading operation due to expiration of Ore Transport Permit as per advice by the Port Authorities. NOTE; March 8, 2014-Saturday No loading operation due to expiration of Ore Transport Permit as per advice by the Port Authorities. 3) BARGES ASSIGNED AND EACH CARGO LOADED CAPACITY BARGE/LCT CAPACITY 1. LCT GF101 1,500 2. LCT GF102 1,500 3. LCT GF105 1,500 4. ABUCAY 440 5. VNG II 550 6. MILAGROS 550 7. BAGAC 450 8. CLUISA 500 4) *****WEATHER AND SEA CONDITION****** Partly cloudy sky w/ Calm sea & Low swell 5) ESTIMATED TIME OF COMPLETION AND DEPARTURE 11th day of March, 2014 @ A.M. IAGW/WP 6) LIST OF SHIPS AT SRMI, LOADING ANCHORAGE 1.) MV JIN HUI -----------Partially loaded Prepared / Reported by: MIKE JOHN E. SEGADOR / MICHAEL P. GALIDO Icasmi / agent’s on board
Posted on: Fri, 07 Mar 2014 23:36:59 +0000

Trending Topics



Recently Viewed Topics




© 2015