Productive day before work. Pretty much have everything as prepped - TopicsExpress



          

Productive day before work. Pretty much have everything as prepped as I can as far as wiring and hardware goes. Wrapped up the QS install, tapped & ran data wiring along with installing the brake pressure sensor at the master, headlights updated to Xenon which puts the stock bulbs to shame without going full HIDs, retired the Contour GPS from butt-cam duty for an iON Air Pro 2, and got the fuel pump in the spare street tank. Couple of small loose end finishing parts scheduled to show up during the week with the suspension/chassis bits should be back at the end of the week or early next. Then to find time to put the bike back together. Hopefully able to sneak in a street ride or two to test out the quickshifter & data logger, as well as get a rough idea of what 30mm offset triples/linear rear link truly means for the 848/1x98 series, before we leave for SoCal on the 16th. :-) This thing has come quite a long way from where it started....
Posted on: Tue, 01 Apr 2014 01:44:01 +0000

Trending Topics



Recently Viewed Topics




© 2015