This stream runs between the two lakes in Clydach Vale. Running - TopicsExpress



          

This stream runs between the two lakes in Clydach Vale. Running parallel and buried in the ground is a pipe which carries enough water to generates enough water to generate power for 60 homes. But there is only one small turbine. So why not more than one and why arent these turbines built along the length of all the valleys rivers? We have a constant flow of water all around us and it is a waste of a resource which should be used.
Posted on: Mon, 22 Sep 2014 15:19:48 +0000

Trending Topics



Recently Viewed Topics




© 2015